Projects

Home>Projects
Projects 2017-05-19T03:24:49+00:00
We at Chesrown Chevrolet Buick GMC are very happy with all of our dealings with CJM. From installing all of our equipment needs in our new building to service after the sale, THEY ARE THERE 100% of the time. Whether we are looking for service on our equipment or looking to purchase any new equipment, CJM is always our first call. We have found that all of their prices are fair and most of all, THEY DO WHAT THEY SAY THEY WILL DO! Everyone we deal with has been exceptional and very responsive. And Chris Beck is a standout in their company; he is AWESOME to work with!
Jay Weaver, Chesrown Buick GMC
Tesla

Audi New Build

CJM partnered with a national dealership design & development company and installed all equipment in new Audi dealership to include:

  • Vehicle lifts, in-ground
  • Exhaust extraction system
  • Air system
  • Lubrication system and fluid inventory control
  • Full detail center
  • Workstations and benches…
View More
Tesla

Chevrolet New Build

CJM helped a growing Chevrolet dealership expand their operations and build a new showroom and service center near the existing store.  Scope of work included:

  • Relocation of 7 vehicle lifts
  • Installation of 20 (dealer-supplied) in-ground vehicle lifts
  • Supply and installation of total fluid management system
  • Supply and installation of waste oil tanks…

View More

Tesla

Toyota New Build

CJM supplied the equipment in a brand new Toyota dealership. CJM installed the following dealer-supplied equipment:

  • 18 Vehicle Lifts
  • Exhaust extraction system
  • Air system
  • Lubrication system
  • Workbenches…

View More

Fiat

Fiat Improvements

This Fiat dealership lacked express lane to provide quick, convenient services for their customers. CJM supplied and installed all equipment for express service lane including wheel balancer, compressor, floor press, transmission jack, floor jack, air assembly, battery jump box, and A/C recovery and recharge machine.

View More

Lincon Fans

Lincoln Improvements

This Lincoln service shop was in need of heat relief during the summer months! They had no air conditioning and only cooling “system” was a few ceiling fans not suitable for an industrial space. CJM provided complete installation of in industrial fans for their service shop.

View More

State Government

State Government – Maintenance Facility New Build

The State of Ohio constructed a new district maintenance facility to service their vehicles.  CJM’s bid to provide and install equipment was accepted by general contractor who was awarded the project.  Our scope of work included the following:

  • Supply and installation of lubrication system
  • Supply and installation of water reels…

View More

Federal Government

Federal Government – Transit Company New Build

This transit company received federal funding to build a new service garage for their handicap accessible busses.  CJM’s bid to provide and install the equipment was accepted by general contractor who was awarded the project.  Our scope of work included supply and installation of the following:

  • Bus wash system
  • Total of 6 light and heavy duty lifts
  • Lubrication system…

View More